Northern Nigerian Breaking News

President Buhari flags off construction of Ajaokuta-Kaduna Pipeline

2

President Muhammadu Buhari on Tuesday flagged off the construction of the 40-inch x 614km Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline project.

The Presidential flag off was performed virtually from the Aso Rock Villa in Abuja.

The flag off was with a simultaneous link to two locations: Rigachukun, Kaduna State and Ajaokuta Steel Complex, in Kogi State.

The project is expected to be completed within a 24-month is a section of the Trans-Nigeria Gas Pipeline (TNGP) with the capacity to transport about 2.2billion cubic feet of gas per day.

Also, the economic benefits of the AKK pipeline which would originate from Ajaokuta, in Kogi State and traverse Abuja, Niger, Kaduna and terminate at Kano, would boost domestic utilization of natural gas for Nigeria’s social-economic development when completed.

elsamad new

Ajaokuta – Kaduna-Kano Pipeline Construction To Commence Soon, Says Buhari At Gas Summit(Opens in a new browser tab)

Bashir Ahmed, New Media Aide to President Muhammadu Buhari said the president while virtually flagging-off of construction of the Ajaokuta-Kaduna-Kano gas pipeline project, says the project is dear to the people of Nigeria and it must succeed.

Also, Kaduna state governor, Nasiru El-Rufai is attending the flag off at Dankade, according to a tweet on the verified handle of the governor.

TVC

2 Comments
  1. 368681 43269Superb read, I just passed this onto a friend who was performing some research on that. And he in fact bought me lunch since I located it for him smile So let me rephrase that: Thank you for lunch! 673868

  2. baixar apk says

    385384 208339The luxury proposed may possibly be incomparable; citizens are never fail to searching for bags is really a Native goals. The idea numerous insert goals uniquely to push diversity with visibility during the travel and leisure arena. Hotels Discounts 283987

Leave A Reply

Your email address will not be published.